| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | ChenMu |
| Model Number : | CM-SZ530-XX-H637 |
| Certification : | ROHS,UL,SGS,CE |
| Price : | Negotiable |
| Payment Terms : | T/T, Western Union, MoneyGram |
| Supply Ability : | 5000PCS/Per week |
| Delivery Time : | 7-10 working days |
Source Factory Supplying Integrated Round High-Power Anti-Glare Stadium High Mast Light Lenses For LED Floodlights.
This means that the lens is a single integrated optical component. Compared with the multi-part lens assembly, this design has easier installation, more complete structure, more accurate optical control, etc. The whole lamp adopts a single integrated mirror-making higher light efficiency
Quick detail
| Product Name: | CM-SZ530-XX-H637 | Beam Angle: | 12°,22°,40°,60° |
| Efficiency: | 92% | Material: | PC |
| LED Chips | 3737/5050 | Size: | Ø530 |
| IP Rating: | IP65 | Power: | 600W,800W,1000W,1200W |
| Application: | Stadium Lights,Flood Lights | ||
Description
Source Factory Supplying Integrated Round High-Power Anti-Glare Stadium High Mast Light Lenses For LED Floodlights.
Specifications:
| Product Name: | CM-SZ530-XX-H637 |
| Beam Angle: | 12°,22°,40°,60° |
| Efficiency: | 92% |
| Material: | PC |
| IP Rating: | IP65 |
| Power: | 600W,800W,1000W,1200W |
| LED Chips | 3737/5050 |
| Size: | Ø530 |
| Application: | High Bay Light, |
| Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
| Main Maket | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: | EXW , FOB , CNF , CIF |
| Payment Terms: | T/T , PayPal , Western Union, Moneygram |
| Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
| Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES

Application:

Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
|